Studio Laboratory Classrooms Top
Chemistry and Physics Studio Lab Classrooms
Project Director: Phil
Bailey, College of Science and Math
Budget: $250,000
|
Construction completed on a 64 seat
chemistry studio classroom. During Spring 1997, Chem
124 was offered with 192 students served. For Fall
1997, a full schedule is offered. Five sections of
Chem 124 and two sections of Chem 125 will accommodate
approximately 448 students in an interactive and collaborative
studio classroom environment.
|
College of Agriculture Studio Lab Classroom
Project Director: Douglas
Genereux, College of Agriculture
Budget: $172,169
|
The Studio Classroom provides students
and faculty with the opportunity to be more successful
in the learning process through the use of multimedia
and electronic equipment, project orientated classes
and student participation. During the 1996-97 academic
year, 86 complete or partial classes were taught in
the lab, translating to 27,898 student hours. Visit
the lab in Bldg. 10, room 215.
|
Technical Support for College of Agriculture Studio Lab
Project Director: Sharon
Woolard, College of Agriculture
Budget: $20,800
|
Technical assistance for the CAGR is
now provided by a computer technician who coordinates
acquisition, installation, maintenance and repair
of computer hardware and software. In addition, student
technical assistants keep the Studio Classroom Complex
working and available for student use.
|
Advanced Computing Top
|
CAD-CAM Lab, including Robotics
Project Director: Gerry
Cunico, College of Business
Budget: $85,000
|
Lab facility scheduled to be completed
and first classes will be held in CAD-CAM lab in Fall
1997. Classes are designed to provide hands-on exercises
and activities that put concepts into practice.
|
Multimedia Workstations for Classrooms
Project Director: Karen
Adams, College of Business
Budget: $40,000
|
Multimedia equipment installed and running
smoothly in 11 rooms. On-going training for faculty
is available at their request.
|
Rendering, Animation, Modeling Lab (RAML)
Project Directors: K.
R. Zweifel, College of Architecture and Environmental
Design, and Eric Johnson, College of Liberal Arts
Budget: $116,884
|
Classes are being held in the RAML during
the 1997-98 academic year. Teams of Art and Architecture
Students collaborate on projects, drawing on the strengths
of both disciplines. The success of the RAML during
1996-97 has encouraged significant industry support
for modification and expansion of the RAML. Visit
the RAML in Bldg. 34, 159B.
|
Environmental Protection Engineering Lab
Project Directors: J.
G. Sczechowski, College of Engineering
Budget: $116,000
The Environmental Protection Engineering Lab is fully operational with ENVE X437 being taught in the lab Fall 1997. ENVE students are investigating real development issues using cutting edge environmental treatment technologies. Visit the Environmental Protection Engineering Lab in Bldg. 13, room 114.
|
|
Instructional Technology Applications Top
|
Integration of Design Education and World Wide Web Applications
Project Director:
Thomas Fowler, College of Architecture and Environmental
Design
Budget: $111,129
Collaborative Intelligent Design System
(CIDS) web site established 1/97. This technology
has and will continue to allow students in Arch 352,
Arch X367, independent study students and grad students
to look at multiple alternatives during the process
of design. The lab has evolved into a "high energy
in-person meeting place" where students get help
in resolving problems both with the use of technology
and through interaction with students from a variety
of different disciplines.
|
Technology Transfer for Information Technology Instruction
Project Directors:
Dan Walsh, College of Engineering
Budget: $126,000
Over 50 undergraduates, graduates and
faculty collaborated to produce multimedia curricular
materials in several proto-studios. Project accomplishments
included restructuring an introductory level engineering
course (CE 114); development of multimedia materials
to accompany EE211 and EE419; development of "Thermotalk"
a web-based multimedia tool; development of a series
of Mechatronics and Manufacturing Case Studies to
be used throughout the IME curricula; the creation
of multimedia versions of Materials 210; and the production
of a web-based, statistical-data-base-linked assessment
tool. Well over 1,000 students used curricular materials
created through this project in 1996-97.
|
World Wide Web Faculty Development Program
Project Directors:
Peggy Lant, College of Liberal Arts
Budget: $98,000
Faculty involved in this program have
completed at least one teaching website and used that
site (or sites) for teaching. To benefit faculty at
Cal Poly and other campuses, a faculty-development
website has been developed by means of which any faculty
member can learn to design a website for use in teaching.
View the website at http://www.multimedia.calpoly.edu/cpp.
|
Interactive World Wide Web Syllabus for Psychology Education
Project Directors:
Chuck Slem and Ned Schultz, College of Liberal Arts
Budget: $49,970
Web sites containing fully functional
interactive syllabi, links between lecture and text
resources and much more have been made available for
students starting in Fall 1996. Surveys of students
in all three quarters of the 1996-97 academic year
show that over 85% of students in Psy202 used the
web resource. Of those who rated the web resource,
96% found the web resources very useful or somewhat
useful.
|
Instructional Technology Across
the Curriculum
Project Director:
Carol Barnes, Extended University Programs and Services
Budget: $20,000
This project provided faculty with funding
to participate in workshops which would generate ideas
for the development of course materials at Cal Poly.
Faculty participated in programs that gave them an
opportunity to share their coursework developments
with others on campus. The project goal is to benefit
students through the use of enhanced classroom presentations
and additional resources to support classroom learning.
|
|
Student Records Top
|
Student Electronic Access to Institutional Information
Project Directors:
Joanne Temple, Information Technology Services and
Euel Kennedy, Enrollment Support Services
Budget: $104,764
MustangInfo (student access to institutional
information on the WWW) served more than 8,700 individual
students (over 50% of the total population) in the
period from September 1996 to July 1997. Students
have direct access to their schedules, grades, financial
aid award and tracking information, holds and many
other types of information. They also have the ability
to change their address and PIN number on-line.
|
Automated Degree Audit
Project Director:
Tom Zuur, Enrollment Support Services
Budget: $110,136
In June of 1997, students who entered
Cal Poly as freshmen, working under the 1994-97 catalog,
in the Colleges of Engineering, Architecture and Business,
were mailed Degree Audit and Progress Reports (DAPR).
These students have an updated document that gives
them their current status on degree progress within
their major as well as bio-demo information and status
of required tests. In addition, college and departmental
staff have access to the on-line audit for review
and academic advising purposes. DAPR will be expanded
to include students in the remaining colleges.
|
|
Advising, Learning Enhancement and Experiential Programs Top
|
Multicultural Agriculture Program Support
Project Director:
Robert Flores, College of Agriculture
Budget: $20,400
The Multicultural Agricultural Program
provides academic support and personal support to
students of all cultural backgrounds in the College
of Agriculture. Cal Poly Plan funds assisted in the
purchase of computers and printers for the Student
Center and in the selection and training of Student
Peer Advisors (SPA's). The SPA's led study sessions,
provided individual instruction and advised students
on a continuing basis. Faculty and staff also held
"open office hours" in the Student Center.
These services and more are scheduled to continue
during the 1997-98 academic year.
|
New Student Success and Achievement Program
Project Director:
Phil Bailey, College of Science and Mathematics
Budget: $75,000
Assisting students in Math and Science
courses (BIO, CHEM, MATH, PHYS and STAT) with traditionally
high failure rates was a primary goal of this project.
By the end of Spring 1997, 69% of the students surveyed
in the targeted courses believed that they would not
have done as well in the course without the support
services (grading, tutoring, study groups) provided
by this program.
|
Math Workshop
Project Director:
Armando Pezo-Silva and Susan Somppi, Student Affairs
Budget: $47,940
During the 1996-97 year, 742 students
were enrolled in 57 math workshops that were part
of the Math Workshop Program. The Cal Poly Plan funded
27 of those workshops. A major goal of the program
was to enhance student learning in high-risk courses.
When students in the workshops rated the helpfulness
of their workshop, 95% responded that the program
had been helpful to them and 94% felt that learning
in the math courses had been enhanced by the workshops.
|
Supplemental Instruction for High Risk Classes
Project Directors:
Armando Pezo-Silva and, Bill Sydnor, Student Affairs
Budget: $72,220
The Supplemental Instruction Project
(partially funded by the Cal Poly Plan) benefits both
students enrolled in the discussion groups and the
student discussion leaders. During the 1996-97 academic
year, 112 discussion groups were organized with 1,179
students involved and 32 discussion leaders. Of those
students enrolled in the discussion groups, 76% earned
A/B/C or CR. By comparison, of the 1,917 students
that chose not to participate, 69% passed their class
with A/B/C or CR. Discussion leaders acquired group
training and leadership skills, strengthened their
knowledge of the subject matter, and increased their
self-confidence.
|
Study Group Leaders and Support
Project Directors:
Armando Pezo-Silva, Patricia Stewart and Bill Sydnor,
Student Affairs
Budget: $19,670
Study groups offer an opportunity for
students to discuss their course material under the
guidance of a study group leader who has taken the
class and received an A or B. Group leaders are trained
to facilitate small group interaction, encouraging
students to practice positive study skills. They refer
students to resources that assist them in improving
their note-taking, time management, test-taking, etc.
In Spring 1997, 596 students requested assistance
from study group leaders.
|
Community Service Program, Study-Service Connections
Project Director:
Sam Lutrin, Student Affairs
Budget: $7,500
During the 1996-97 academic year, 156
students in six different courses (nine separate sections),
participated in Study-Service Connection. This project
is a service-learning program that engages students
in community-based service experiences directly related
to the courses in which they are enrolled. This project
provides both service to the community and promotes
student learning in course-specific factual concepts
and information and other important areas such as
life skills (for example, working with people different
than oneself), civic responsibility and attitudes.
|
Re-entry/Older Student Services
Project Director:
Pat Harris, Student Affairs
Budget: $4,870
In 1996-97 an orientation program was
created for re-entry students and presented as part
of WOW. Workshops were held to introduce students
to student services. A resource list and newsletter
were developed and distributed to over 3,000 students.
|
|
Curriculum Integration and Restructuring Top
|
Revision of Liberal Studies Program
Project Director:
Robert Cichowski, College of Liberal Arts/University
Center for Teacher Education
Budget: $4,800
Computers in the computer lab 02-101
had memory upgrades and most had removable disk drives
installed. Software was upgraded to provide resources
needed for Liberal Studies X211-212. Development of
new Interdisciplinary GE&B courses will continue
in 1997-98.
|
Integrated MBA Core
Project Director:
David Peach, College of Business
Budget: $35,000
Cal Poly Plan funding was provided to
redesign the MBA core curriculum. During the 1996-97
academic year, a team of eight faculty members created
a curriculum design that reduces the number of required
first-year core units by 25%, from 48 to 36. The curriculum
is being offered as a year-long, 36-unit course. The
new course has been scheduled for the 1997-98 school
year. The curriculum designed under this project puts
Cal Poly at the cutting edge of graduate management
education in the U.S..
|
Integrated Undergraduate Business Core
Project Directors:
Dan Walsh, Wally Mark, K. R. Zweifel, Walter Rice;
Colleges of Engineering, Agriculture, Architecture
and Environmental Design, and Business
Budget: $68,000
One primary goal of this project was
to offer non-technical undergraduate students an introductory
exposure to and understanding of science and technology.
A group of faculty members from three colleges came
together to develop a quality technical exposure for
all majors. Thirty-five students were enrolled and
received credit for Engineering X112, "The Technological
Endeavor," a four-unit course which surveyed
modern technology.
|
Technical Exposure for Liberal Arts and Science and Mathematics Majors
Project Directors:
Dan Walsh, Wally Mark, K. R. Zweifel, Walter Rice;
Colleges of Engineering, Agriculture, Architecture
and Environmental Design, and Business
Budget: $68,000
One primary goal of this project was
to offer non-technical undergraduate students an introductory
exposure to and understanding of science and technology.
A group of faculty members from three colleges came
together to develop a quality technical exposure for
all majors. Thirty-five students were enrolled and
received credit for Engineering X112, "The Technological
Endeavor," a four-unit course which surveyed
modern technology.
|
First Year
Internal Reallocation of Funds Top
|
Internal Reallocation to Expand Library Services
Project Director:
Hiram Davis, Library Services, Kennedy Library
Budget: $150,000
Funding for additional library services
allowed the library to be open on Saturdays earlier
in the quarter, open earlier in the morning and remain
open later in the evening during the week (a total
of 45 hours per quarter). Overall circulation increased
35%. Library staff expanded their outreach program
to every college-related dorm, teaching dorm residents
how to use the library's extensive Web resources.
Top
|